Daisypath Anniversary tickers
Showing posts with label projects. Show all posts
Showing posts with label projects. Show all posts

Tuesday, January 8, 2013

Things to Accomplish in 2013

Goals not Resolutions for 2013 These are not in any particular order. 1.Read a book for every week of the year. I will be happy with 2 books a month--I am just challenging myself. So far this goal is going very well. We are in week 2 of January and I am about finished with my second book.
Head in the Clouds by Karen Witemeyer was my book for week 1.
A Tailor Made Bride is the book I am reading now. I should easily be finished by Saturday with only 117 pages to go. We will see if I can keep this trend up and read a book for every week. I will really need some great suggestions to keep this up throughout the year. If you haven't tried one of Karen Witemeyer's books you should. I have read everything that has been published so far and can't wait until June 2013 when her new book comes out! 2.Finish the blue cable blanket.
I have 79 rows left to finish and that includes the bind off row. I have all the yarn and supplies I need. 3.Knit something out of my comfort zone. This means something besides blankets, scarfs, and rags. 4.Do something crafty with Charles 5.Play in the snow with the family. 6.Rake leaves into a pile and jump in. 7.Color eggs with Patrick and Charles and take Charles to an Easter egg hunt. 8.Try a new recipe. 9.Go tubing or white water rafting. 10.Donate 10 inches to locks of love. 11.Make or do something on Pinterest. 12.Do a moviethon with Patrick. Watch a set of movies that are sequels complete with popcorn & candy or cookies. 13.Encourage others: prayers, cards, emails, and phone calls.

Saturday, July 30, 2011

One Step Closer....Projects Inside &Outside

We have talked of purchasing blinds for the kitchen for awhile. We finally got them. They are now up. Too bad they were an absolute pain to get up and to remove the extra portion at the bottom. It would be nice for products to have better parts and clearer directions. Sorry to complain but really if you spend money that you work hard for it is a royal pain to end up with a product with poor directions and poor parts/design.
The next step is for window toppers. Suggestions are welcome. We are not sure what color to go with.
This is a picture of the other window in the kitchen. It is over the sink. This is the best picture I could get.
Patrick spent many hours trying to dig up these stumps. He broke down and rented a stump grinder. It ended up being much cheaper to rent and D.I.Y. it than to hire someone.We are now rid of the four stumps we had in our yard. We had 2 guys show up and help out and to check out the big yard toy in action. Thanks Jeff and Mike for your help and time!!!This stump needed to be smaller before grinding it. Thanks again to Jeff and Mike for doing this portion of the task since Patrick had stitches in his hand from broken glass. Our yard is coming along quite well. Patrick has been a very busy man working hard to make our yard a more beautiful place.

Tuesday, July 5, 2011

Update through Pictures

So Blogger has had me frustrated. Sometimes pictures will upload and at other times it simply refuses to upload for me. So some of the pictures are from June 27th up through last night. I hope you enjoy.


Pictures from our fireworks:




We enjoyed July 4th with many friends at the Grote's house. We had fun hanging out with everyone, and the food was excellent! Followed up with some magnificent fireworks from Breda that we could see from the Grote yard.


The basement: Patrick has been working on sealing all external walls down in our basement. First- He had to clean the walls with a solution to get rid of all deposits.

Second- Patch any places that needed it with hydraulic cement. He did a little more than was probably needed but it is better to be cautious now than have a mess in the basement from rain. Third- paint on dry-lock wall sealer (2 coats are needed).A good portion of one wall mostly completed.





These are the first steps in getting this room ready to finish totally. At least now when we go down to the basement for a storm the walls will be sealed and the room is clean/organized. The interior wall now has shelving and now I can find things I need better. I am thankful for a husband who likes projects and works hard. The basement is a project that will be done as we can afford to do the necessary project steps, so little things along the way. I will post progress pictures as they come along.




Me at 34 weeks.


The Iowa Cubs game we went to on June 27th: we left at the end of the 9th and they played until the 15th inning. We were able to catch the end of the game when we got back home around midnight. The CUBS WON!